
Side or rear additions, a second storey, an addition on piles: gain space without leaving your sector.
Construction Hibou builds home additions in Brossard, from the older sectors north of Highway 10 to the newer developments in the south.
An addition is often the simplest answer for a family that is short on space but wants to keep its neighbourhood, its school and its lot. The challenge is joining the new to the old: foundation, framing, roof and siding have to read as one house, as if it had always been that way. As an RBQ-licensed and insured general contractor, we coordinate the project from the first visit to handover, together with the architect or engineer your project needs.
In Brossard, the age of your house shapes the job. The city has no boroughs: its territory is organized into sectors identified by a letter, which is also the first letter of the street names, and these sectors follow the waves of development that began after the Champlain Bridge opened in 1962. North of Highway 10, we add on to houses that are several decades old, so the existing foundation and framing are assessed first. In the south, developed from the 2000s on, the structure is recent and the project is mostly shaped by siting rules (setbacks, lot coverage, height). See also construction in Brossard (in French) and our general page on home extensions.
The right type of addition depends on your lot, your house and how much space you want to gain.
An addition on the side of the house, on the ground floor or over two levels. The side setback usually sets the maximum width, so we check it on the site plan before anything is drawn. A good option for a bigger kitchen, an extra bedroom or a home office.
The backyard usually offers the most depth. A rear addition opens the living area onto the garden (a bigger kitchen, a family room, access to a future deck) without touching the street façade.
Adding a storey to a bungalow increases living space without using up the yard. First, an engineer checks that the existing foundation and walls can carry the new load, and the structure is reinforced where needed.
Instead of a poured foundation, the addition sits on piles, which limits excavation on the lot. It suits small additions and sunrooms well. In Brossard, the permit form then requires a report signed and sealed by an engineer.
From the first meeting to handover — organized and transparent.
We assess your project and give you a clear, detailed quote.
Project planning, budget planning and scheduling — with you.
Our team delivers the work properly and on time.
Final walkthrough with you, clean site, impeccable result.
An addition requires a permit from the city. Brossard processes its own applications, with no borough in between: the file goes to the urban planning department (Direction de l'urbanisme), by email or in person at city hall.
According to the city's permit application form for additions, an application is only complete with these documents:
• a site plan (plan d'implantation), prepared by a land surveyor where applicable;
• architectural plans;
• a detailed quote or estimate for the work, where applicable;
• a power of attorney, if the applicant is not the owner.
Depending on the project, the city may ask for more documents for its review, including foundation and structural plans. A report signed and sealed by an engineer is required for an addition on piles or on a concrete slab. Some projects also need approval from city council. All documents must be to scale, and a certificate of location is required after the permit is issued.
Requirements and review fees can change, so we confirm the current version with the city when we put your file together. See the official page (in French): City of Brossard: applying for an addition permit (application form, PDF).
Two additions of the same size can have very different budgets. What makes it vary:
• The type of addition — an addition on piles, an addition on a foundation and a second storey are three different jobs.
• The age of the house — north of Highway 10, tying into a foundation and framing that are decades old takes more preparation.
• Site conditions — excavation, drainage and the type of foundation depend on what we find on the lot.
• Professional plans — architectural plans, the site plan and, where needed, engineering plans are in the budget from the first version.
Every project is priced after a free consultation.
Much of an addition's schedule is decided before the first shovel hits the ground. What sets the timeline:
• The professional file — the plans have to be ready before the permit application is complete.
• The permit review — the city reviews the file and may ask for additional documents.
• The season — excavation and foundations are planned outside the frost period; framing and the building envelope follow.
• The size of the project — an addition on piles is finished sooner than a second storey.
You get a step-by-step schedule adapted to your house and your sector, and we keep you informed until handover.
Construction Hibou is an RBQ-licensed (5798-4619-01) and insured general contractor. You can check the licence in the Régie du bâtiment du Québec register.
We coordinate the professionals (architect, engineer), the permit file and the job site. You deal with one contact from start to finish.
Consultation, planning, execution, handover: you always know where the project stands and what comes next.
Since 2021, we have worked across Greater Montreal, South Shore included. Our projects are in the gallery.
Addition projects carried out by our team in Greater Montreal.
Yes. An addition requires a permit from the City of Brossard, which processes its own applications. The file goes to the urban planning department, by email or in person at city hall. We prepare and file it with you.
The city's form requires a site plan, architectural plans and, where applicable, a detailed quote for the work. Depending on the project, foundation and structural plans may be requested, and a certificate of location is required after the permit is issued.
Yes. It is an option for an addition or a sunroom that limits excavation. In that case, the city's permit form requires a report signed and sealed by an engineer.
Yes. North of Highway 10, in the oldest part of the city, the existing foundation and framing are assessed first. In the south, on newer houses, siting rules are what mostly limit the size of the addition.
Often, yes, since much of an addition is built outside the lived-in space. We protect the work area and only open into the house when it is time to connect. A second storey is more disruptive, and we discuss it during planning.
We build additions in every sector of Brossard, from the established neighbourhoods north of Highway 10 to the developments in the south. See also residential renovation in Brossard, construction in Brossard and construction in Longueuil (in French).
Tell us how much space you want to gain and where. Free consultation, no commitment.